Work started a couple of months ago. This image shows an early view:
Phase 2 will be further to the left, a single baseboard featuring a dock. Phase 3 will be to the right, coming back down the third wall, three baseboards including a viaduct, quarry and the top station. Phase four will be to complete the fourth side of the loop.
Last weekend I finally finished wiring. It was not a huge job as far as these things go, with only 9 points and a single isolated section, but not my favourite job!
So this is the current state of the lower station. The buildings at the back are all SuperQuick, and date from my childhood. Eventually they will be replaced by scratchbuilt models. the station building is the one from the Mark 1 layout, so does not fit. Replacing that will be a priority. The old one might be suitable for the middle station if the bottom story is removed.
Clearly a lot of work still to be done, but it does feel like I am gettng somewhere at last!